PROJECT

Location
Montebelluna, Treviso
System capacity
1 MWP
PR
COD
2025
Location
Maneira, Bevera
System capacity
1.3 MWp
PR
85%
COD
04/2024
Location
Lungotorrente Secca, Genoa
System capacity
260 kWp
PR
83%
COD
09/2024
Location
Cesare Beccaria, Mantova
System capacity
350 kWp
PR
83%
COD
01/2024
Location
Livorno City
System capacity
120 kWp
PR
84%
COD
12/2024
Location
Piero Calamandrei, Arezzo (Italy)
System capacity
120 kWp
PR
84%
COD
4/2025