CGT LIVORNO

About the Project

Location:

Livorno City

System capacity:

120 kWp

PR:

84%

COD:

12/2024

BEC is proud to have successfully completed a rooftop photovoltaic system for CGT Livorno, located in the city of Livorno.

CGT is a leading Italian group specializing in the supply of industrial machinery and solutions.

With a total capacity of 120 kWp, the plant is scheduled for completion and entry into operation by December 2024. The project confirms BEC's ability to effectively manage photovoltaic plants of different scales and technical requirements.

The long-term collaboration with CGT strengthens BEC's role as a strategic partner in the energy transition of the Italian industrial sector.